Day 120 and a visit to the newly restored Cutty Sark sailing ship in dry dock at Greenwich. These vessels have an amazing amount of rigging and one of the volunteers told me that it took 2 - 3 months to set it up and it is constantly having to be replaced. Traditionally the rope was tarred to make it last longer, but given the near disastrous fire of a few years ago that is not an option! The ship has three masts, but even with a wideangle lens it was not possible to include everything.
Leica M9
Tri-Elmar-M 16-18-21
Focal length 16 mm
1/350 sec
f/8
ISO 160
PAD 120 - Rigging
-
- Posts: 7316
- Joined: Tue 11 Sep 2012, 16:38
- Contact:
PAD 120 - Rigging
- Attachments
-
- Rigging
- Rigging.jpg (140.45 KiB) Viewed 1515 times
Re: PAD 120 - Rigging
Which is your favourite strong diagonal
-
- Posts: 7316
- Joined: Tue 11 Sep 2012, 16:38
- Contact:
Re: PAD 120 - Rigging
The one on the right.
Who is online
Users browsing this forum: Bing [Bot] and 38 guests